Ashby Ponds ILB 2.1

General Contractor : Whiting-Turner Contracting Co.

Cubic Yardage : 4,625

Status : Under Construction

Project Information

This mixed-use project is a four-story structure above a basement garage with an area of approximately 41,000 sq. ft. per floor in a “H-shaped” plan. There will be 25 apartment units per floor. The total gross area is 211,650 sq. ft. The building also includes a one-story enclosed pedestrian bridge attached to the existing adjacent building. BVC elements include foundations, walls, SOG and post tension (41,500 sq. ft.) and toppings.

21170 Ashby Ponds Boulevard,

Ashburn, VA 20147

BVC Project Services

Concrete Frames

 

Steel Frames

 

Specialized Cast-in-Place

 

Hambro® Installation

 

Tilt-up

 

Post Tension

Yes

Talk With Us

Social

  

Our Location

Belfast Valley Contractors
3809 Edgewater Place
Baltimore, MD 21222

410-288-2233